Does WIKA offer installation assistance?
Yes, we offer full service installation when there is a critical need to meet a fast schedule for installation. We can supply the personnel necessary to route, position, test and commission our assemblies. Alternatively, WIKA can also supply superv ...
moreIs welding to the reactor needed in order to retrofit a FLEX-R®?
No, the FLEX-R® was developed to easily retrofit to existing reactors. The technology can be retrofitted, using proper supports, with attachment to non-pressure retaining elements of the reactor internals.
What design verification is provided with the FLEX-R® flange assembly?
ASME code calculations are performed to determine the suitability and sizing of the primary connection, the secondary connection, and the secondary containment chamber. All welds are liquid dye penetrant tested (LPI). The assembly receives an inter ...
more