Does WIKA offer installation assistance?
Yes, we offer full service installation when there is a critical need to meet a fast schedule for installation. We can supply the personnel necessary to route, position, test and commission our assemblies. Alternatively, WIKA can also supply superv ...
moreWhat design verification is provided with the FLEX-R® flange assembly?
ASME code calculations are performed to determine the suitability and sizing of the primary connection, the secondary connection, and the secondary containment chamber. All welds are liquid dye penetrant tested (LPI). The assembly receives an inter ...
moreCan the FLEX-R® be installed in the reactor in the horizontal position?
Yes, the FLEX-R® can be installed in any position. However, care should be taken to ensure the internal structures are tightly secured in their proper position.